Figure 3: Removing the front cover
▶
Push in the lock on the left side and remove the front cover in a slight angle
from the front.
4.3
Shutting down the server
CAUTION
▶
"Important information" on page 29
.
This step is only required when upgrading or replacing non-hot-plug
components.
▶
Inform the system administrator that the server will be shut down and put
offline.
▶
Terminate all applications.
▶
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
▶
Shut down the server.
If the system is running an ACPI-compliant operating system (OS),
pressing the On/Off button will perform a graceful shutdown.
Basic hardware procedures
46
Upgrade and Maintenance Manual
RX4770 M6
Содержание PRIMERGY RX4770 M6
Страница 80: ...Basic hardware procedures 80 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 166: ...Hard disk drive HDD solid state disk SSD 166 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 298: ...Liquid cooling LC 298 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 314: ...Accessible drives 314 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 386: ... Resuming BitLocker functionality on page 104 System board and components 386 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 420: ...FUJITSU Server PRIMERGY RX4770 M6 System Cabling Overview System Cabling Overview English Cable Plan for November 2020 ...
Страница 428: ...9 RX4770 M6 Power 8x2 5 Cable Plan System Board BTM D3892 A100 C100 PWR 1 8x 2 5 HDD Backplane 1 PWR CA05950 2195 ...