Figure 15: Locking the cable clamp of a PSU
▶
Pull the cable clamp up (1).
▶
Thread the power cord through the cable clamp (2).
▶
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.8
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
"Important information" on page 29
.
▶
Press the On/Off button to start up the server.
▶
Ensure that the power-on indicator is lit green.
Basic hardware procedures
60
Upgrade and Maintenance Manual
RX4770 M6
Содержание PRIMERGY RX4770 M6
Страница 80: ...Basic hardware procedures 80 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 166: ...Hard disk drive HDD solid state disk SSD 166 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 298: ...Liquid cooling LC 298 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 314: ...Accessible drives 314 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 386: ... Resuming BitLocker functionality on page 104 System board and components 386 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 420: ...FUJITSU Server PRIMERGY RX4770 M6 System Cabling Overview System Cabling Overview English Cable Plan for November 2020 ...
Страница 428: ...9 RX4770 M6 Power 8x2 5 Cable Plan System Board BTM D3892 A100 C100 PWR 1 8x 2 5 HDD Backplane 1 PWR CA05950 2195 ...