192
Upgrade and Maintenance Manual
RX1330
M1
Expansion cards and backup units
Ê
If the BBU is shown as bad or defective, do not power off the server for at
least 12 hours to allow the charge and calibration cycles to finish.
Ê
If the BBU status does not change after 12 hours, please try to initiate the
recalibration process manually using the ServerView RAID Manager.
I
If this procedure still does not fix the BBU status, please contact your
local Fujitsu customer service partner.
9.5.2
Installing an FBU
9.5.2.1
Preliminary steps
Ê
"Disabling SVOM boot watchdog functionality" on page 64
Ê
"Shutting down the server" on page 45
Ê
"Disconnecting the server from the mains" on page 46
Ê
"Getting access to the component" on page 47
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Tools:
Phillips PH1 / (+) No. 1 screw driver (for installing TFM)
Содержание PRIMERGY RX1330 M1
Страница 62: ...62 Upgrade and Maintenance Manual RX1330 M1 Basic hardware procedures ...
Страница 150: ...150 Upgrade and Maintenance Manual RX1330 M1 Hard disk drives solid state drives ...
Страница 156: ...156 Upgrade and Maintenance Manual RX1330 M1 Fans ...
Страница 204: ...204 Upgrade and Maintenance Manual RX1330 M1 Expansion cards and backup units ...
Страница 234: ...234 Upgrade and Maintenance Manual RX1330 M1 Optical disk drive ...
Страница 312: ...312 Upgrade and Maintenance Manual RX1330 M1 Appendix ...