CX272 S1
Upgrade and Maintenance Manual
187
System board and components
9.1.4
Concluding steps
Perform the following steps:
Ê
Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê
"Installing the server node in the Dual Node Cluster Server" on page 72
Ê
If applicable, reconnect all external cables.
Ê
"Switching on the server node" on page 73
Ê
"Verifying the system time settings" on page 86
Содержание PRIMERGY CX272 S1
Страница 14: ...Upgrade and Maintenance Manual CX272 S1 Contents ...
Страница 18: ...18 Upgrade and Maintenance Manual CX272 S1 Introduction ...
Страница 92: ...92 Upgrade and Maintenance Manual CX272 S1 Basic software procedures ...
Страница 156: ...156 Upgrade and Maintenance Manual CX272 S1 Main memory ...
Страница 166: ...166 Upgrade and Maintenance Manual CX272 S1 Processors Figure 93 Opening the load plate B Ê Fully open the load plate ...
Страница 220: ...220 Upgrade and Maintenance Manual CX272 S1 System board and components ...
Страница 234: ...234 Upgrade and Maintenance Manual CX272 S1 Appendix ...