CX272 S1
Upgrade and Maintenance Manual
183
9
System board and components
This chapter provides information on how to replace the system board module
and system board components as its CMOS battery and the USB Flash Module
(UFM).
Safety instructions
V
CAUTION!
●
Devices and components inside the server remain hot after
shutdown. After shutting down the server, wait for hot components to
cool down before installing or removing internal options.
●
Circuit boards and soldered parts of internal options are exposed and
can be damaged by static electricity. Always discharge static build-up
(e.g. by touching a grounded object) before handling electrostatic-
sensitive devices (ESDs).
●
Do not touch the circuitry on boards or soldered parts. Hold circuit
boards by their metallic areas or edges.
●
For further information, please refer to chapter
"Important
information" on page 29
.
9.1
Replacing the CMOS battery
CMOS memory (volatile BIOS memory) and the real-time clock are powered by
a lithium coin cell (CMOS battery). This cell lasts up to ten years, depending on
ambient temperature and use.
If the CMOS battery is depleted or falls below minimum voltage levels, it need
to be replaced immediately.
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools:
tool-less, recommended: tooth pick
Содержание PRIMERGY CX272 S1
Страница 14: ...Upgrade and Maintenance Manual CX272 S1 Contents ...
Страница 18: ...18 Upgrade and Maintenance Manual CX272 S1 Introduction ...
Страница 92: ...92 Upgrade and Maintenance Manual CX272 S1 Basic software procedures ...
Страница 156: ...156 Upgrade and Maintenance Manual CX272 S1 Main memory ...
Страница 166: ...166 Upgrade and Maintenance Manual CX272 S1 Processors Figure 93 Opening the load plate B Ê Fully open the load plate ...
Страница 220: ...220 Upgrade and Maintenance Manual CX272 S1 System board and components ...
Страница 234: ...234 Upgrade and Maintenance Manual CX272 S1 Appendix ...