CX272 S1
Upgrade and Maintenance Manual
113
Expansion cards
6.3.1
Installing expansion cards
6.3.1.1
Preliminary steps
Perform the following steps:
Ê
"Disabling SVOM boot watchdog functionality" on page 75
Ê
Locate the desired server node with the ID button.
Ê
"Shutting down the server node" on page 41
Ê
"Removing the server node from the Dual Node Cluster Server" on page 42
Ê
"Removing the riser module" on page 68
Ê
"Removing SAS RAID controller" on page 130
(if applicable)
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Software: 5 minutes
Tools:
Phillips PH2 / (+) No. 2 screw driver
Содержание PRIMERGY CX272 S1
Страница 14: ...Upgrade and Maintenance Manual CX272 S1 Contents ...
Страница 18: ...18 Upgrade and Maintenance Manual CX272 S1 Introduction ...
Страница 92: ...92 Upgrade and Maintenance Manual CX272 S1 Basic software procedures ...
Страница 156: ...156 Upgrade and Maintenance Manual CX272 S1 Main memory ...
Страница 166: ...166 Upgrade and Maintenance Manual CX272 S1 Processors Figure 93 Opening the load plate B Ê Fully open the load plate ...
Страница 220: ...220 Upgrade and Maintenance Manual CX272 S1 System board and components ...
Страница 234: ...234 Upgrade and Maintenance Manual CX272 S1 Appendix ...