U41169-J-Z156-4-74
81
Installation
Routing the Leads
Figure 46: Leads Routing
Ê
Connect the leads to the system unit and to the storage subsystem.
V
CAUTION!
The cables must have enough over-length when connecting to the
storage subsystem (see
). This is necessary to prevent them
being pulled out of the connectors when the system is withdrawn from the
rack (the mains connectors could be pulled out unintentionally).
Ê
Route the leads as shown in the
Ê
Insert the leads through the cable guides.
Ê
Secure the leads to the hinged cable carrier with the cable tie (1).
1