11.11 Routing the Leads
The leads of the storage subsystem are routed in the rack in such a way that the
slide-in unit can be pulled forwards without the leads having to be loosened.
The cable galleries and a swivelling arm on which the cables are routed are
located in the interior of the DataCenter rack (on the right if seen from the rear
of the rack). The procedure can be found in the chapter “Cable Management“ in
the DataCenter rack manual.
In other rack models, the leads are secured to hinged cable carriers. The hinged
cable carrier is in the installation kit for the 42-HE rack. The screw and the
spring-loaded nut which are used for installation form part of the racks or the
mounting kit belonging to the rack.
Figure 45: Hinged Cable Carrier
Proceed as follows:
Ê
Secure the hinged cable carrier with the screw to the spring-loaded nut fitted
to the installation pillar according to the description in the rack manual. The
hinged cable carrier must be fitted within the height range of the storage
subsystem.
V
CAUTION!
The hinged cable carrier should be fixed on the installation pillar only.