background image

 

BUBBLER PARTS 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DATA CONNECTIONS 

 
Use the following diagram for datalogger to Bubbler connections.

 

 

SDI-12 Connections 

 

4-20mA Connections 

Pin 

Description 

  Pin  Description 

12 VDC 

  3 

Ground 

Serial data 

  4 

4-20mA positive 

Ground 

  5 

4-20mA negative 

Chassis ground 

  6 

Chassis ground 

 
 

 

1  2  3  4  5  6 

PINS

 

Barbed hose fitting 
for desiccant hose  

Bubbler outlet  
(orifice line connection)  

Bubbler air 
intake fitting 

Power 
terminal block  

Data terminal block  

 

Содержание Bubbler

Страница 1: ...EXTREME ENVIRONMENTS EXTREMELY RELIABLE 700 Bubbler QS Rev 1 11 Dec 2019 Part 20792 BUBBLER Installation and Quick Start Guide...

Страница 2: ...ions Connecting the Desiccator Orifice Line Power 2 3 3 4 5 6 CONFIGURING THE BUBBLER Default Settings Configuring Using the Bubbler s Front Panel Bubbler s Menu Tree Configuring with Axiom Datalogger...

Страница 3: ...olt to a vertical surface using the corner mounting plates 3 Connectors and outlets should point down DESICCATOR USE 1 A desiccator MUST be used on the Bubbler s air inlet line 2 The entire air intake...

Страница 4: ...orifice line to aid in securing the line in a fixed position Install the line outlet perpendicular to the flow in flowing water Secure the terminal end of the orifice line in a fixed position and with...

Страница 5: ...Connections Pin Description Pin Description 1 12 VDC 3 Ground 2 Serial data 4 4 20mA positive 3 Ground 5 4 20mA negative 6 Chassis ground 6 Chassis ground 1 2 3 4 5 6 PINS Barbed hose fitting for des...

Страница 6: ...PPLIED DESICCATOR 1 Mount the desiccant bracket 2 Remove the shipping plugs from the inlet and outlet sockets 3 Wrap Teflon tape around the threads of the barbed desiccant adaptor fitting Part 19469 S...

Страница 7: ...lace the nut and ferrules on the line as shown and fully insert the line into the Bubbler s outlet fitting 2 Screw the nut on until finger tight 3 Mark the nut at the 6 o clock position 4 Use a wrench...

Страница 8: ...use To connect the power cable 1 Remove the power terminal block from the port 2 Secure the power wires to the appropriate pins positive and negative 3 Connect the power cable to the power source posi...

Страница 9: ...MENUS PRESSURE PURGE BLEED STAGE UNITS 4mA 20mA Output mA SLOPE SITE FAULT STAGE OFFSET TANK PSI PURGE SET STAGE SETUP DIAGNOSTICS SITE ADDRESS RATE TEMP F C AVG DUR SDCARD BATTERY TEMP VERSION UPDATE...

Страница 10: ...o use a pre configured Datalogger or load a Configuration file from a USB stick 1 Insert the USB stick into one of the USB HOST ports on the Datalogger and select Station About Load Configuration 2 Co...

Страница 11: ...Home Sensors Bubbler Icon Once a valid reading has been returned select the Set Stage button and enter the stage reading 4 Set up Telemetry Logging Data Set up cog Add and other desired Features NOTE...

Страница 12: ...d here Address query Response will be the SDI 12 address aI Send Identification Responds with identifying information on sensor at the input address aAb Change address b the new address MEASUREMENT CO...

Страница 13: ...efault 10 8 aXBVLP p Get set battery voltage low P p is the minimum voltage that will trigger a battery fault Default 8 0 aXDOM Get date of manufacture Format is YYYYMMDD aXDTYYYYMMDD HHMMSS Get Set d...

Страница 14: ...et is set to zero does not zero the stage reading only the offset aXSLP Get set slope Range 0 100 999 999 Used when the site requires non standard stage unit See X command aXSUP for the built in list...

Страница 15: ...ample takes approximately 2 seconds aXSUP Get Set stage units 0 ft feet slope 2 307 1 in inches slope 27 680 2 m meters slope 07 03 3 cm centimeters slope 70 3250 4 mm millimeters slope 703 250 5 cu C...

Страница 16: ...tubing to the Bubbler 19443 1 5m SDI communication cable with flying leads both ends 19442 1 5m SDI communication cable MC one end and flying leads other end 18945 8ft cable with 20A fuse flying lead...

Отзывы: