GT7- 2K / 4K / 8K / 9K / 16K
Ultraviolet System Manual
Contents
Technical Overview ...................................................................................................................................... 2
I. Important Notes ..................................................................................................................................... 2
II. Specifications ........................................................................................................................................ 2
III. WARNING............................................................................................................................................ 2
IV. Before you Purchase/Open .................................................................................................................. 2
V. Space Requirements ............................................................................................................................ 3
VI. What is Ultraviolet Sanitation ............................................................................................................... 3
VII. Example Applications ......................................................................................................................... 3
Installation Introduction ................................................................................................................................. 4
I. Site Preparation ..................................................................................................................................... 4
II. Mounting ............................................................................................................................................... 4
III. Installing Connections .......................................................................................................................... 4
IV. Thermal Relief Valve ........................................................................................................................... 4
V. Filter Protection .................................................................................................................................... 4
Commissioning & Start-up ............................................................................................................................ 4
I. Quartz Thimble Installation ..................................................................................................................... 4
II. Ballast Operation .................................................................................................................................. 5
III. Installing the UV Lamp ......................................................................................................................... 6
Maintenance ................................................................................................................................................. 7
I. Replacement Parts................................................................................................................................. 7
Troubleshooting ............................................................................................................................................ 8
Страница 1: ...ements 3 VI What is Ultraviolet Sanitation 3 VII Example Applications 3 Installation Introduction 4 I Site Preparation 4 II Mounting 4 III Installing Connections 4 IV Thermal Relief Valve 4 V Filter P...
Страница 2: ...must be followed closely to prevent serious personal injury Ensure eye protection is worn when servicing and installing this unit to protect from harmful UV C Radiation This radiation can be harmful...
Страница 3: ...ounding plumbing must be earthed to prevent electrolysis which will cause corrosion VI What is Ultraviolet Sanitation Ultraviolet sanitation works by breaking down the cell wall of a micro organism al...
Страница 4: ...to install a TRV to limit the temperature When installing a TRV note the below requirements The TRV must be installed on the Outlet of the UV System which should be the open end The TRV tube must be a...
Страница 5: ...last Operation GT7 8K PS The 10W 40W ballast is straightforward for operation It features a lamp status failure indicator light along with an audible alarm should there be a fault The ballast will aut...
Страница 6: ...ow the lamp to fire Do not look directly at the lamp without eye protection c Confirm that the lamp lights up correctly and the ballast is showing a green light to signify that the lamp is running cor...
Страница 7: ...ough Thus we recommend replacing the lamp every 12 months and the thimble every 1 2 years Lamp Replacement Every 12 Months GT7 2K Lamp 14W Replacement UV Lamp Suit GT7 2K GT7 4K Lamp 20W Replacement U...
Страница 8: ...et a chance to cool down effectively If there are significant fluctuations in usage or flow rates it is good practice to install a thermal relief valve sold separately on the outlet of the UV chamber...
Страница 9: ...arranty period please contact the manufacturer for further instructions 2 Check the wall socket with a different electrical appliance to check if the GPO is functioning Also check your circuit breaker...
Страница 10: ...plumber The consumer is responsible for keeping record and proof of installation in the form of an invoice and or receipt Filter systems must be maintained as per FSA recommendations including the us...
Страница 11: ...warranty is subject to terms and conditions outlined below This extended warranty covers the below parts of the system Ultraviolet Chamber 316 Stainless Steel Extended Warranty Qualification Extended...