FSA GT7- 16K Скачать руководство пользователя страница 5

3.  Place the o-ring over the exposed end of the glass thimble and seat the o-ring firmly against the 

thread, as shown above. 

4.  When the o-ring is seated, install the knurled nut onto the chamber to seal the o-ring against the 

sealing nut. NOTE: Firmly hand tightening is sufficient to seal these chambers without the use of 
tools 

– DO NOT APPLY THREAD TAPE OR SEALANT GLUE TO THE END THREADS. 

Caution: Overtightening the end nuts may cause the glassware to crack.

 

5.  You can look through the open end of the nut to see if the o-ring is seated correctly. There will likely 

be a slight gap between the end edge of the thimble and the recessed stop-end of the knurled nut - 
this is normal in most cases (for the 2K & 4K Systems). On the larger GT7-8K & GT7-9K systems, 
the spring holds the quartz under tension, so there may not be a gap once firmly tightened. 

From this point, the water supply should be turned on to pressurise the chamber and identify if there are 
any leaks from the plumbing connections or from the thimble. If leaking occurs from the thimble, it is 
possible that it may only be a slow beading leak which must to be rectified before installing the lamp. 

For vertical installations, it is extremely important that there are no slow leaks, as over time, these will fill up 
the thimble with water and cause a short in the lamp, which can result in injury or damage to the lamp & 
ballast. This is not covered under warranty. 

If any water is present on the thimble or chamber from the installation process, it will need to be thoroughly 
dried before continuing with the installation.  

II. Ballast Operation 

GT7-8K-PS

 

– The 10W – 40W ballast is straightforward for operation. It features a lamp status & failure 

indicator light along with an audible alarm should there be a fault. The ballast will automatically reset when 
turned on/off. 

GT7-16K-PS

 - In order to guarantee user safety, this ballast features complete control and protection 

functions which are caused by; 

1.  UV Lamp exceeding life cycle (365 Days). 
2.  UV Lamp Failure. 
3.  Working beyond rated voltage and load. 

This ballast is designed to work with germicidal UV lamps. Do not mistake the input/output wire to avoid 
ballast failure. 

  Ensure the voltage is within the specification of the ballast. 

  Match the UV lamp with the power output of the ballast. 

  Ensure the connections (plugs) are fitted correctly 

– the earth wire must be affixed securely. 

Working Condition:

 Green LED light of ballast ON, No Red LED, Digital Display indicating # of Days 

Fault:

 Red LED on / Flashing, Audible alarm 

Working Timer Function: 

The First timer indicates number of operating days from 0 to 9999, the Second 

timer indicates UV lamp working life which is a countdown from 365 days to 0. The UV lamp working life is 
set by default but you can switch between these indicators by pressing and holding the “SELECT” button 
for 2 Seconds (repeat this to return to Default). 

UV Lamp Replacement Alarm:

 Once the UV lamp working day timer reaches 0, the digital display will 

show “A3”. The Red LED light will flash and there will be an audible alarm to remind you to change to a 
new lamp. 

Ballast Reset:

 When the lamp has been changed

, press and hold the “SELECT” button for 10 seconds 

until the display shows “RSET” – Continue holding for a further 5 seconds until the display shows “0365” 
and you will hear an audible beep. Release the button and the timer is successfully reset. 

 

 

Содержание GT7- 16K

Страница 1: ...ements 3 VI What is Ultraviolet Sanitation 3 VII Example Applications 3 Installation Introduction 4 I Site Preparation 4 II Mounting 4 III Installing Connections 4 IV Thermal Relief Valve 4 V Filter P...

Страница 2: ...must be followed closely to prevent serious personal injury Ensure eye protection is worn when servicing and installing this unit to protect from harmful UV C Radiation This radiation can be harmful...

Страница 3: ...ounding plumbing must be earthed to prevent electrolysis which will cause corrosion VI What is Ultraviolet Sanitation Ultraviolet sanitation works by breaking down the cell wall of a micro organism al...

Страница 4: ...to install a TRV to limit the temperature When installing a TRV note the below requirements The TRV must be installed on the Outlet of the UV System which should be the open end The TRV tube must be a...

Страница 5: ...last Operation GT7 8K PS The 10W 40W ballast is straightforward for operation It features a lamp status failure indicator light along with an audible alarm should there be a fault The ballast will aut...

Страница 6: ...ow the lamp to fire Do not look directly at the lamp without eye protection c Confirm that the lamp lights up correctly and the ballast is showing a green light to signify that the lamp is running cor...

Страница 7: ...ough Thus we recommend replacing the lamp every 12 months and the thimble every 1 2 years Lamp Replacement Every 12 Months GT7 2K Lamp 14W Replacement UV Lamp Suit GT7 2K GT7 4K Lamp 20W Replacement U...

Страница 8: ...et a chance to cool down effectively If there are significant fluctuations in usage or flow rates it is good practice to install a thermal relief valve sold separately on the outlet of the UV chamber...

Страница 9: ...arranty period please contact the manufacturer for further instructions 2 Check the wall socket with a different electrical appliance to check if the GPO is functioning Also check your circuit breaker...

Страница 10: ...plumber The consumer is responsible for keeping record and proof of installation in the form of an invoice and or receipt Filter systems must be maintained as per FSA recommendations including the us...

Страница 11: ...warranty is subject to terms and conditions outlined below This extended warranty covers the below parts of the system Ultraviolet Chamber 316 Stainless Steel Extended Warranty Qualification Extended...

Отзывы: