74
Test Procedu-
re
(continued)
-
Next, the display will show „SYNC
AC
,“ the grid icon will blink
5. Startup test
-
Before the Fronius IG Plus begins feeding power into the grid, grid
conditions are tested according to local regulations
-
‘START
UP
’ will appear on the display
6. Grid power feed-in
-
Once the tests have been completed the Fronius IG Plus starts
feeding power into the grid
-
The display shows the current power feeding into the grid
-
The Operating Status LED is illuminated green and the Fronius IG
Plus is in operation
The startup test can take anywhere from just a few seconds up to
several minutes depending on local regulations. Progress is indicated
by a vertical segment bar which reduces in size from top to bottom.
Two of the previously flashing dividing marks disappear for every 10%
of the total duration of the startup test that has been completed.
4. Only for the Italy country setup (ITA setup): Auto test
-
The Fronius IG Plus tests the grid monitoring function
-
The display alternates between ‘AUTO
TEST
’ and ‘AUTO
OK
’
Содержание Fronius IG Plus 100
Страница 2: ......
Страница 4: ...ud_fr_st_et_01382 012008...
Страница 14: ...6...
Страница 15: ...7 General Information...
Страница 16: ...8...
Страница 20: ...12...
Страница 21: ...13 Installation and Startup...
Страница 22: ...14...
Страница 71: ...63 Closing Fronius IG Plus Closing Froni us IG Plus 1 1 4 2 7 3 5 6...
Страница 77: ...69 Operation...
Страница 78: ...70...
Страница 118: ...110...
Страница 119: ...111 Troubleshooting and Maintenance...
Страница 120: ...112...
Страница 141: ...133 Appendix...
Страница 142: ...134...
Страница 152: ...144...
Страница 155: ......