68
Commissioning
The Fronius IG Plus has been pre-configured at the factory and is ready
to use.
You can assign individual numbers as per ‘The Setup Menu’ section in this
manual.
Factory Confi-
guration
Once the Fronius IG Plus has been connected to the solar modules (DC)
and the public grid (AC), turn the main switch to position - 1 -.
NOTE
Regardless of whether bolts or fuses are used, do not
operate the Fronius IG Plus without fuse covers.
Commissio-
ning
-
If the solar modules are supplying enough power, the Operating Sta-
tus LED will light up orange. The startup phase will be shown on the
display. When the LED lights up orange, this indicates that the Fronius
IG Plus is about to start up automatically.
-
Once the Fronius IG Plus has completed its automatic startup, the
LED will be green.
-
Provided that power continues to feed into the grid, the LED will re-
main green to confirm that the Fronius IG Plus is functioning correctly.
1
off
on
1
2
ON
Содержание Fronius IG Plus 100
Страница 2: ......
Страница 4: ...ud_fr_st_et_01382 012008...
Страница 14: ...6...
Страница 15: ...7 General Information...
Страница 16: ...8...
Страница 20: ...12...
Страница 21: ...13 Installation and Startup...
Страница 22: ...14...
Страница 71: ...63 Closing Fronius IG Plus Closing Froni us IG Plus 1 1 4 2 7 3 5 6...
Страница 77: ...69 Operation...
Страница 78: ...70...
Страница 118: ...110...
Страница 119: ...111 Troubleshooting and Maintenance...
Страница 120: ...112...
Страница 141: ...133 Appendix...
Страница 142: ...134...
Страница 152: ...144...
Страница 155: ......