General information
Froling GmbH, Industriestrasse 12, A-4710 Grieskirchen, Austria
Page 7
www.froling.com
M1060008_US
1
1
General information
It is unlawful to carry out modifications to the boiler or to change or
deactivate safety equipment.
In addition to the operating instructions and the applicable national and
local codes and regulations for installation and operation of the boiler
system, all fire, police, and electrical regulations must be observed.
1.1
Installation Hazards
Install, modify and use only in accordance with manufacturer’s manuals.
Refer to authorities having jurisdiction for proper installation. Contact
local building and fire officials about restrictions and installation
inspection in your area. If there are no applicable local codes, follow
ANSI/NFPA 211 and CAN/CSA B365. Special precautions are required
for passing the Chimney through a combustible wall or ceiling.
Inspect and clean exhaust system, Fuel Loading Chamber, Combustion
Chamber, Ash-Pits, and Heat Exchanger frequently in accordance with
owner’s manual.
DANGER!
Working on electrical components may cause severe injuries from electric
shocks!
WARNING!
The electrical system of the boiler shall be supplied from a double 115 V 60
Hz (nominal 230 V AC) 15 amp branch circuit including neutral and ground
connection. For wiring instructions please refer to Section 3.7 in this
Installation Manual!
Chimney must be 6’’ (150 mm) diameter listed UL-103 HT or ULC-S629
residential all-fuel type or tile-lined masonry. Flue connector pipe must be
6’’ (150 mm) diameter made of a minimum 24 MSG black steel.
Inadequate design, installation and maintenance of the flue gas system will
lead to insufficient chimney draft and could result in Danger of Life or
Severe Injury caused by serious faults in combustion, e.g. explosively
combustion of wood gases and flash fires!
This boiler requires fresh air for safe operation and must be installed so
there are provision for adequate combustion and ventilation air!
CAUTION!
Do not connect this unit to a Chimney flue serving another appliance!
Flooring must be a minimum 3/8’’ (10 mm) non-combustible material
covering the installation clearance area! The floor must be level and
reinforced if required. For construction of the floor beneath the boiler please
pay attention to weight of boiler, water content and wood fuel according to
the Installation Manual!
This boiler is not for use with an automatic stoker
Connect to an existing boiler system in combination with heat storage only!
Use original spare parts only. Installation of non-licensed replacement parts
will void the warranty!
Содержание FHG 20
Страница 2: ...Update Date May 2014 Reprint date Nov 2014...