![Froling FHG 20 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/froling/fhg-20/fhg-20_installation-manual_2338695019.webp)
Boiler Installation
Boiler Assembly
Froling GmbH, Industriestrasse 12, A-4710 Grieskirchen, Austria
Page 19
www.froling.com
M1060008_US
3
3.2
Setting up in the boiler room
3.2.1
Moving the boiler in the boiler room
Position a fork-lift or similar lifting device at the base frame of the
boiler and move it to the designated position
To prevent damage:
Move the boiler without jarring or jolting
Risk of damage to firebrick-lined combustion chamber.
Move the packing materials carefully
Risk of scratching the insulation
Position the boiler at the designated location
The boiler must be positioned so that it is rise slightly towards the
supply fitting
Observe the minimum distances from other objects in the boiler
room
3.2.2
Minimum distances in the boiler room
Always set up the boiler in accordance with all applicable standards and
regulations. The following minimum distances must be observed in all
cases:
A
Front of Appliance to Combustibles
inches
36
B
Side Wall to Appliance
inches
9
C
Back Wall to Appliance
inches
14
D
Ceiling to Appliance
inches
18
E
Combustibles to Flue Pipe
inches
18
Содержание FHG 20
Страница 2: ...Update Date May 2014 Reprint date Nov 2014...