Boiler Installation
Boiler Assembly
Froling GmbH, Industriestrasse 12, A-4710 Grieskirchen, Austria
Page 35
www.froling.com
M1060008_US
3
Installing the lambda probe
Unscrew the pre-installed bushing from the lambda probe
Screw the bushing into the flue gas nozzle and tighten gently
Screw the lambda probe into the bushing and tighten gently
Never place a wrench or pliers on the cylindrical metal body
Installing the rear insulation covers
Install the cabling
See chapter 3.7 Electrical
connection
Position the pieces of insulating wool
pad on the left and right of the flue
pipe nozzle
Position the insulation covers