Place the cable tray on top of the
insulating wool pad and insert it into
the recess provided in the insulating
side panel
Prepare the next insulating side
panel
Repeat the same steps as for the
previous insulating side panel
Use the side panel bracket (1)
instead of the door bracket
described above.
Fit the left-hand insulating side
panel at the base of the boiler
Ensure that the panel is properly
engaged in the tab at the base of
the boiler.
Mount the panel onto the bracket
using the threaded bolt
Fit the spacer washers and screw
the nuts on lightly
Remove the protective film from the
upper and lower spacer plates
Mount the upper spacer plate at the
upper end between the insulating
side panels
Mount the lower spacer plate at the
lower end between the insulating
side panels and secure it using 2
self-tapping screws