5 | Transport and storage
42
M1980822_en | Installation instructions Wood chip boiler T4e 20-180
5.4.2 Operating and maintenance areas of the equipment
▪ The system should generally be set up so that it is accessible from all sides to allow
quick and easy maintenance!
▪ Regional regulations regarding necessary maintenance areas for inspecting the
chimney should be observed in addition to the specified distances!
▪ Observe the applicable standards and regulations when setting up the system!
▪ Comply with additional standards for noise protection!
(ÖNORM H 5190 - Noise protection measures)
D1
D
B
A
C
E
T4e 20-60
T4e 80-110
T4e 130-180
A
700 mm
800 mm
800 mm
W
150 mm
C
500 mm
D
300 mm
D1
300 mm
1)
E
500 mm
2)
1. When using electrostatic particle separator ESP (optional)
2. Maintenance area to expand the WOS springs upwards