Assembly | 6
M1980822_en | Installation instructions Wood chip boiler T4e 20-180
49
r
Remove the pipe section and ball valve
r
Seal line regulating valve instead
Ä
IMPORTANT: Pay attention to direction of flow. Arrow (A) must point downward!
r
Install centre back panel
r
Remove the perforation on the cover plate
Ä
Remove the burrs with a half-round file
r
Install cover plate on the balancing valve
6.3.6 Adjusting the height of the ash container
r
Pull out the spring cotter on the transport wheels and adjust the height
Ä
If the ash container is mounted, the wheels rest on the ground
r
Remove the ash container from the boiler and level it using the adjustable foot