5 | Transport and storage
40
M1980822_en | Installation instructions Wood chip boiler T4e 20-180
Also for T4e 80-110:
r
Disconnect the plug connection (A) from the Lambda probe cable
r
Protect the cable from damage
r
Hang the crane hook on the two eye bolts in the flue gas collection chamber and bring
in the boiler
5.4 Positioning at the installation site
5.4.1 Remove boiler from pallet
r
Cut through the strapping and lift off the cardboard
r
Open the insulated door and pull the key plate from the safety limit switch
r
Use the locking lever to unlock the ash container and pull off the ash container from
the boiler