Friant Tiles Скачать руководство пользователя страница 24

Page 24

Tiles

 Installation Manual

Supporting Pedestals and Lateral Files

Installation

Page 24

Supporting Pedestals Installation

1.  All Pedestals (except Mobile Pedestals) 

must attach to the supporting Worksurface.

2.  Check the Pedestal height to ensure it 

fits under its supporting Worksurface. 
If it is not the correct height, adjust 
the Glides on the Pedestal or raise the 
Worksurface.

3.  To install the Pedestal, first open the top 

drawer. Unlock the Pedestal with the key 
located inside the top drawer. Remove the 
two (2) box drawers or the top file drawer, 
depending on the Pedestal configuration.

NOTE: To remove the drawers, lift the dis-
lodging brackets on each side of the drawer 
at the front of the suspensions, and pull 
forward.

4.  With the Pedestal in place, attach the 

Mounting Screws at the front and rear of 
the Worksurface and tighten.

5.  Carefully re-insert the drawers into the 

track.

NOTE: Always recheck the drawer for proper 
operation after installing the Pedestal.

6.  Check to ensure the lock is working 

properly.

Keys

Lock

Dislodging Brackets

Mounting Screw
Location

Supporting Lateral Files

1.  All supporting Lateral Files must attach 

to the supporting Worksurface.

2.  Check the Lateral File height to ensure 

that it will fit under the supporting Work-
surface. If it is not the correct height, 
adjust the Glides on the Lateral File or 
raise the Worksurface.

3.  To install the Lateral File, repeat the 

above steps.

Содержание Tiles

Страница 1: ...Tiles Installation Manual Complete instructions to install the Friant Tiles panel system...

Страница 2: ...ip Installation 10 8 Wire Electrical In Frame Power Jumper and Pass Through Power Jumper Installation 11 8 Wire Electrical Beltline Power Transfer Installation 12 Fabric Tiles Marker Board Tiles Perfo...

Страница 3: ...Installation Manual Introduction The Tiles System Installation manual provides the necessary instruction for the safe installation of the Tiles System for The Installers with visual and written instru...

Страница 4: ...shoulders of adjacent Cap Screw of Draw Rod NOTE Be sure that the Glides are all the way in at the bottom of the Frame If floor is very uneven Glide adjustment should be made during assembly of produc...

Страница 5: ...ectangular opening at the bottom of the Frame Line up the Cap Screw on the Draw Rod with the notched tab on the smaller Frame 5 Lift the shorter Frame and Draw Rod so the bottom hook on the Draw Rod e...

Страница 6: ...Finished End WARNING A Change of Height Wedge must be installed when two Frames or Connectors of unequal height are connected Frame Top Cap must be in place prior to installing Finished End Change of...

Страница 7: ...Nut as shown 5 Tighten bolts into nut plate 6 Reinstall Top Cap on Stacking Frame Stacking Frame and Stacking Connector Installation WARNING Never install Worksurfaces on Stacking Frames Never instal...

Страница 8: ...ntry plugs directly into a Power Retro assembly at a Duplex Outlet connection point 2 Locate the appropriate connecting point on the Frame The Base Cover must be opened to allow access 3 Pass the Flex...

Страница 9: ...Baseline Power Retro over Bot tom Rail and line up holes in the Power Retro mounting bracket with the holes in the Bottom Rail 2 Secure with the Self Tapping Screws provided and tighten securely 3 Co...

Страница 10: ...Installation Duplex Clip Installation 1 Insert Clip at an angle into slits on top of the Beltline Power Support Bar 2 Straighten Clip and slide Clip either left or right over the Duplex Outlet Duplex...

Страница 11: ...install the Flex Conduit Power Jumper place connecting end into the right hand Receptacle Bracket on Power Retro Press in until fully engaged and the spring tab clicks into position 2 Repeat this proc...

Страница 12: ...of the connector and takes the place of the Festoon 1 To install the Flex Conduit connect Beltline Power Transfer Jumper to the Beltline Power Retro on one Frame Let Flex Conduit drop down below the...

Страница 13: ...angle Engage Bottom Hooks into the slots on vertical member of the Frame Right hand slot fits into keyhole slot Pivot Tile forward until the top Clips engage into Frame Pressure is required to snap t...

Страница 14: ...with screws provided Power and Data Tiles 1 Secure Latch Plates from hardware pack with screws provided 2 Holding Tile at an angle engage bottom hooks into the slots on the vertical mem ber of the Fr...

Страница 15: ...nd back Insert Top Tab on each Shelf End hanger bracket in to the slots on the Frame or Wall Strip Rotate front of Shelf End down to fully engage all clips into slots 3 Lock Shelf Ends in place by pus...

Страница 16: ...d 2 With Door Cover Assembly in the open position lower rear slots in door guides over the back Mounting Screws 3 Push Door Cover Assembly back until front slots in door guides drop over Front Mountin...

Страница 17: ...side 4 Push down on all Worksurface supports to ensure all hooks are fully seated in slots 5 Install Shoulder Screws and Front Spacers provided onto Worksurface in pre drilled holes 6 Install Worksurf...

Страница 18: ...ide install Center Support on center Frame at the same height as the Cantilevers on the right and left side 5 Push down on all worksurface supports to ensure all hooks are fully seated in slots 6 Inst...

Страница 19: ...Repeat procedure for Cantilever on other side of the Worksurface 4 Install Shoulder Screws at the back of the Worksurface in pre drilled holes Do not install Front Spacers yet 5 Install Worksurface o...

Страница 20: ...g Bracket Self Drilling Screws Transaction Surface Mounting Brackets Screws Rectangular Transaction Surface 1 Remove Top Tiles from both sides of Frame 2 Remove existing Frame Top Cap from Frame and s...

Страница 21: ...uired Worksur face height NOTE Safety Clip must be secured to End Panel and Frame Failure to do so could cause product instability and or physical injuries 4 Install Safety Clip into Hanger Frame and...

Страница 22: ...ew faces under the Worksurface and is not visible from the End of Run 5 Adjust Safety Clips and Attachment Bracket for right or left application 6 Align bottom Attachment Bracket with bottom slot in H...

Страница 23: ...rame at the proper location with door swing on the desired side of Frame 3 Connect Door Frame to adjacent Frame with Draw Rod 4 Adjust adjacent Frame Glides so door opening is square with the door Doo...

Страница 24: ...e the drawers lift the dis lodging brackets on each side of the drawer at the front of the suspensions and pull forward 4 With the Pedestal in place attach the Mounting Screws at the front and rear of...

Страница 25: ...5 1 10 4901 EAST 12th St Oakland California 94601 T 510 535 5113 F 510 535 5237 friant com...

Отзывы: