
Page 14
Tiles
™
Installation Manual
Rail Tiles, Power and Data Tiles Installation
Latch Plate
Frame
Screws
Rail Tile
Adjustable Clip
Tiles can be removed individually from
any position. When more than one Tile is
removed from the same Frame, remove the
upper Tile first.
Rail Tiles
Installation is the same for other Tiles
except:
1. Secure Rail Tile to the Frame with
screws provided.
Power and Data Tiles
1. Secure Latch Plates (from hardware pack)
with screws provided.
2. Holding Tile at an angle, engage bottom
hooks into the slots on the vertical mem-
ber of the Frame. Right hand slot fits into
keyhole slot. Pivot Tile forward until the two
clips engage into Latch Plates. Pressure
is required to snap the Clips into Latch
Plates.
3. To remove Tiles, reverse the above
procedure.
Wire Management
1. If wire management is required, install the
adjustable clip into the hole in Latch Plate.
2. Hang cables from the Adjustable Clip.