16
19. Orient the Top Weight (9) and the Drop-down
Weight (10) as shown.
Slide the Top Weight (9), the two Upper Weight
Bumpers (16), the Drop-down Weight (10), and
the two 25mm Snap Rings (39) onto the Weight
Guides (7).
Next, slide the two Weight Guide Bushings (18)
onto the upper ends of the Weight Guides (7).
Attach the two 25mm Snap Rings (39) to the
Weight Guide Bushings (18).
Then, tighten the two M8 x 35mm Set Screws
(19) into the Weight Guide Bushings (18).
20
20. Remove all parts (23, 29, 31, and 32) from the
pulley bracket on the Tower Frame (1).
Route the Cable (40) through the pulley bracket
and downward through the hole in the center of
the Tower Frame (1).
Attach the Small Pulley (23) inside the pulley
bracket with the M10 x 50mm Socket Bolt (29),
the two M10 Washers (31), and the M10
Locknut (32) that you just removed.
Make sure
that the Cable (40) is between the Small
Pulley and the rod on the pulley bracket.
19
29
1
31
23
Rod
31
32
40
10
16
9
39
19 18
18
19
7
1