10. Procedures and inspection
10.1.
Drop test procedure
•
Load platform with up to 110% of the nomimal load.
•
Before the drop test, lower the unit to the ground and make sure the green light indicators of
the main control panel (
CC1
) are lit before proceding with the test.
•
Only a qualified technician holding a valid
Level 1 (Safety and operator)
training card may
proceed with this test.
•
Important!
This test must per performed once every three (3) years. Fill the register (Fraco
SD2 Data on safety device use) of the safety device manual.
Steps:
1. On the main control panel (
CC1
), turn the "
WORK / STOP / DROP"
selector key
(1)
to the
"
CHUTE/DROP"
position.
2. On the main control panel (
CC1
), connect the
drop test remote control
(2)
.
3. Lower the remote control to the base of the platform. Leave the platfom and close the door
behind you.
Important!
All doors must be closed.
4.
Important!
Set up a safety perimeter conforming to effective local regulation. Make sure all
surrounding persons are informed and conscious of the test.
5. Elevate the platform to the height of four (4) mast sections, approximately 20'-0" (6 m) by
turning the selector of the remote control to the "
HAUT/UP"
position
(3)
.
Note :
do not press the "
ACTIVER/ENABLE"
button
(5)
during movement of the platform.
This button blocks the selector controls
(3)
.
6. To proceed with the drop, simultaneously "
ACTIVER/ENABLE"
(5)
et "
TEST DE
CHUTE/DROP TEST"
(4)
buttons of the remote control.
Figure 45