Transport platform
SEP Serie
SEP u
ser’s manual Page 30 of 89
Doc no. RD-7243-MA-001-02
4.9.5. Hoisting chains (optional)
As explained in
SECTION
FROM PAGE
, it is possible de rise/move the platform with
hoisting chains attached to the four (4) hoisting points present on the unit.
The chains must respect the dimensions indicated in section 6 and must be able to support the
the unloaded platform, 6,500 lbs (2 950 kg).
∞R
EFER TO SECTION
FROM PAGE
4.9.6. Heating system (optional)
A heating system is available to warm mechanical and electrical components (brakes, motors,
electrical boxes, etc.) when the machine is used in a cold environment.
Note:
The motors, brakes and other electrical components may be equipped with a permanent
heating system. These heating systems are necessary when the platform is use at temperatures
of
5°C (41°F) and below
. Keep the power boxes (
principal, GC1
) and main control pannel (
CC1
)
energized at all time.
ATTENTION!
NEVER TURN OFF
the power box disconnectors if using heating systems. Also,
don’t turn off the main supply input.
Note:
Use at temperatures of
MINIMUM
-20°C (-4°F).
4.9.7. Overload detector (optional)
The overload detector allows to detect the value of the load disposed on te platform and to
establish a maximum charge load. When the limit is exceeded, the overload detector may send a
signal, triggering a visual and/or sound warning, restrict certain functions of the machine, or cut
the power supply to the motor unit.
4.9.8. Level communication system (optional)
The level communication system allows communication between the unloading floors/levels, the
ground protection mesh level and the platform. Each landing door may be equipped with this
system.
Содержание SEP-5000
Страница 1: ......