Doc no. RD-7243-MA-001-02
Figure 18
– Installation outrigger
5. Installation data
Warning!
This section of the document
is not
an installation guide but a simple list of reminders,
recommandations and requirements to respect, relative to the assembly/disassembly of the
machine. Detailed explanations of assembly/disassembly are available in the installation manual
(RD-7243-MA-002).
5.1. Types of bases
Information about the use and installation of the bases is available in the installation manual (RD-
7243-MA-002).
5.1.1. Base with adjustable jack legs:
For dimensions,
REFER TO THE
ND MAST SECTION WEIGHT AND DIMENSIONS
ON PAGE
5.2. Foundation requirements
•
The foundation must be horizontal and have sufficient load capacity.
•
Depending on height of the installation and ground conditions, crushed stones, a concrete
slab or a thick steel plate must be used as a foundation. This foundation must be used to
distribute the load of the base supports.
•
The size of the foundation depends on the installation (model, height, number of platforms,
etc.) Generally, a concrete slab must be at 12" (300mm) thick and crushed stone must be
between
4″ (100 mm) and 6″ (150 mm) thick.
•
The foundation must be installed above the level of the ground protection mesh, or at the
same level as the ground protection mesh. If the foundation is installed beneath the level of
the ground protection mesh, the soil must be drained.
•
All foundations must be leveled.
•
Compact the ground under the foundation.
•
If there is a risk of frost heave, the foundation must be isolated.
•
All foundation specifications must de detailed in the engineering package specific to the
project installation.
•
Total weight (
S
EE SECTION
ON PAGE
of the SEP and mast sections is transfered
to the ground through the base and its legs.
Figure 19
– Bolted base for mast 26
"
x 26
"
(RD-7243-BA-100)
Right base outrigger
(RD-7243-BA-106)
Left base outrigger
(RD-7243-BA-102)