3.2. Controls and commands
The following controls and commands are present on the machine at the indicated
locations:
Main control panel (
CC1
)
installed on the platform
Operator control box (
CC2
)
installed on the platform
Ground box power supply (
GC1
)
installed on the ground protection mesh.
Drop test Remote control (
DRC
)
to be connected to main control panel (CC1),
keep out of the platform
3.3. Requirements regarding assembly/disassembly
personnel
Installation personnel must hold a valid
Level 2A ou 2B (Installation)
training card.
The machine may only be assembled, operated and maintained by authorised persons able to
guarantee execution according to their training, knowledge and experience, and conscious of the
associated risks. These persons must be designated by the contractor for assembly, disassembly
and maintenance tasks. These persons should hold a competence card delivered by local
authorities, a union or by FRACO.
These persons must also be familiar with the
user’s and installation manuals.
3.4. Requirements regarding operating personnel
Operating staff must hold a valid
Level 1 (Safety and operator)
training card.
The machine may only be operated by authorised persons able to guarantee execution according
to their training, knowledge and experience. These persons must:
•
Be designated by the contractor to operate the machine.
•
Therefore, be informed of the risks.
•
Be familiar with the
user’s manual.
•
Understand the operational logic and the functions of the machine.
•
Follow local standards and regulations in effect.
•
Make the necessary verifications before the work shift and make the periodic verifications.
•
In case of malfunction, stop and lower the unit to the ground. Contact your FRACO
representative.