Part No.26107 Rev J August 2018
- 22 -
Inline 5000 Series Cabinets
Setting Up
cont.
REFRIGERATED CABINETS - INSTALLATION
Cabinet
Preparation
Remove all tapes, ties and packers, used
to prevent movement during transit.
Lift out the deck trays and grills to gain
access to the cabinet well.
Earthing
WARNING-THIS APPLIANCE MUST BE EARTHED/GROUNDED
The cabinet should be earthed via the earth lead in the mains
cable.
In addition, an equipotential earth bonding terminal is provided,
to allow the cabinet to be bonded to a building surge earth or
adjacent equipment.
Power Supply
Before connecting to the power supply, check that the local supply is correct to
that shown on the rating plate, located on the rear of the cabinet.
Isolation
If the cabinet is not connected by a plug and socket, but is hard wired to the
mains supply, a means of isolation must be provided.
If a plug and socket are used, they should still be accessible after the cabinet is
installed.
Location
REFRIGERATED CABINETS
-
INSTALLATION
Ventilation
The vent located on the rear of the cabinet must never be obstructed. If
obstructed the cabinet may overheat and cause an electrical malfunction.
Before use, operate the cabinet for 1-2 hours to remove any fumes or odours,
which may be present.
Access
The cabinet should also be positioned so the operating panel and shelves are
easily reachable for loading and unloading.
Содержание IN 5C08
Страница 1: ...Refrigerated Cabinets...
Страница 46: ...Part No 26107 Rev J August 2018 46 Inline 5000 Series Cabinets Sliding Door Cabinets Types IN 5C08 12 15...
Страница 47: ...IN 5C08 12 15 18 24 47 Future Products Group Tilt Door Cabinets Type IN 5C18...
Страница 48: ...Part No 26107 Rev J August 2018 48 Inline 5000 Series Cabinets Sliding Door Cabinets Type IN 5C18...