Each E1T requires three signal lines, one to switch the 300V supply, one to reset the tube to zero
and one to step the tube by one. Therefore eighteen control lines are required which are
transferred using the three 2x3 headers. Finally, the SPI bus is made available for expansion
purposes.
Page 102
Version 1.0
Copyright Grahame Marsh/Nick Stock 2019
Содержание An E1T Timepiece
Страница 79: ...Fortress How It Works Board Schematics and Function Page 79 Version 1 0 Copyright Grahame Marsh Nick Stock 2019...
Страница 82: ...Page 82 Version 1 0 Copyright Grahame Marsh Nick Stock 2019 1 1 SAM3X8C schematic...
Страница 108: ...Page 108 Version 1 0 Copyright Grahame Marsh Nick Stock 2019...
Страница 109: ...Page 109 Version 1 0 Copyright Grahame Marsh Nick Stock 2019...
Страница 110: ...Page 110 Version 1 0 Copyright Grahame Marsh Nick Stock 2019...
Страница 120: ...E1T Data Sheet Page 120 Version 1 0 Copyright Grahame Marsh Nick Stock 2019...