![Forpark Australia Backhoe Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/forpark-australia/backhoe/backhoe_installation-manual_2320467009.webp)
8
FORPARK AUSTRALIA | www.forparkaust.com.au
INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
CUBE & BASKET
(Uprights are part of the structure)
Connect uprights to horizontal upper and lower bars using Tri-lobes
10x20mm.
Mark and dig four (4) holes for the uprights 300mm x 300mm wide and
800mm below finished ground level.
Position the frame in the holes ensuring the top of the upper horizontal
bars are 2400mm above finished ground level. The distance between the
inside of each upright should be 1815mm (refer below).
Attach the slant upright to the rock wall using Tri-lobes 10x20mm. Raise
the rock wall, mark and dig the hole for the upright. Attach the rock wall
to the frame with Tri-lobes 10x20mm.
Attach all ropes and chain ends to the frame with bolts M8x25mm as
shown below.
Attach basket ropes to basket as shown with 17mm Tri-lobes and
washers. (Basket is shown separate for clarity)
Must use LOCTITE on all bolts.
Hang the pommel chains, mark and dig holes in ground approx. 600mm
below finished ground level and 300mm x 300mm wide. Attach anchors
to chains, lower in the holes and concrete footings (approx. 300mm x
300mm x 300mm).
Keeping the frame square and corner uprights vertical, concrete footings 300mm x300mm x400mm (deep).
Back fill holes with soil.
Содержание Backhoe
Страница 1: ...FORPARK PRICE LIST AS AT 11 23 2017 ...