18
FORPARK AUSTRALIA | www.forparkaust.com.au
INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
MATRIX
(To be supplied with Orbit Manual and Arched Rock Wall
Installation Manual.)
Dig 3 holes 500x500mm and 1000mm deep in line with
2950mm distance on the side of the rock climber.
Dig 2 holes 500x500mm and 1000mm deep on 2100mm
from the first 3 holes, 5900mm apart for the second
arched frame.
Insert legs into top arches with welded castings towards
centre of structure and attach using cap nuts and bolts
10x100 C/H as shown. One of the top arches includes an
extension for the Arched Rock Wall Upright. Connect top
of Arched Rock Wall Upright to frame using cap nut and
bolt 10x100 C/H.
Rise frames in the holes and attach cross rails using
standard Orbit clamps 50 to 90 fittings (see Orbit Manual).
Mark the position of the arched Rock Wall leg, dig a hole
according Orbit Manual and join to main frame. Attach
Rock Wall according Orbit Manual.
Attach plastic rings and flanges to rubber membranes
with bolts and cap nuts as shown.
Attach all ropes to frame using bolts M8x24 Post
Torx as shown. Ensure that all rubber membrane
to rope attachments are tightened very well and
Loctite is used. If attaching clamps are to come
loose, tearing of the rubber membrane may occur.
Keep frame level and concrete legs as shown
(Arched Rock Wall according Orbit Manual).
For the 4 vertical ropes in the middle of the
structure dig a 300mm wide channel, 600mm
deep directly below the 4 ropes. Connect anchors
using an ‘S’ hooks and allow the anchors to hang
into the holes, ensuring that they are taut. Pour
300mm deep concrete in anchor holes.