INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
ST HOOP (FOR RUBBER) (POLISHED)
For keeping the right distance between legs, attach the legs to the ring. Mark
and dig the holes 300mm x 300mm x 600mm deep. Pour concrete around the
base of the pole forming a footing of 400mm deep concrete, the top being
200mm below the finished surface level (rubber). Ensure that the legs are
vertical and allow 24h before bolting the ring using S/S Bolts M10x16 Post
Torx, S/S washers M10 and T nuts.
SWAY NET
Dig holes for the two uprights spaced at approximately 4000mm apart (when
measured from the centre of the holes). The holes should be approximately 900mm
deep and 500mm square. Insert the uprights making sure they are level with the top
standing 3.4m above the finished surface level
and the eye bolts are facing inwards. Pour
concrete around the base of the poles forming
a footing of 500mm x 500mm x 600mm (deep),
the top being 300mm below the finished
surface level with a tapered top so that water
won’t pool around the upright. (The footing
extends 100m below the base of the upright so
either the first 100mm of the footing should be
allowed to set first or the pole should be rested
on a brick or block before pouring the footing.)
Ensure that the uprights are vertical after the
concrete is poured. Leave the concrete to set
for at least 24 hours before attaching the
remainder of the Sway Net. Once the concrete is set, connect the ropes supporting the
sway net to the uprights using ‘D’ Shackles. Snap tags off and file sharp edges.