![Forpark Australia Backhoe Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/forpark-australia/backhoe/backhoe_installation-manual_2320467034.webp)
33
FORPARK AUSTRALIA | www.forparkaust.com.au
INSTALLATION MANUAL – FREE STANDING STATIC 23
November 2017
TWIN PEAKS
Position all uprights according the plan with 800mm deep in ground for corners and 1000mm deep in ground
for center uprights. Join uprights with pipes using plastic
clamps. Concrete uprights when are vertical using 500mm x
500mm x 500mm footings with tapered top so that water
won’t pool around uprights.
After the concrete is set attach middle and top star joints.
Attach the net using 6 Orbit Aly Plugs with 6 Orbit Bolts for
top net connection.
Connect the turnbuckles of the net to the brackets of the
pipes at the corners using security caps (M12 blue) on nuts as shown
and ropes to the middle star joints.
Attach D shackles with chains as shown, cut tags from D shackle bolts
and file any sharp corners.
Apply ‘loctite’ to all bolts, nuts and turnbuckles. Apply equal tension
on all 4 corners using the turnbuckles.
Clamp 50-90
D-Shackles, Chains & Security Caps
Star Joint Assembly
Security Cap (for Tech Screws)
Содержание Backhoe
Страница 1: ...FORPARK PRICE LIST AS AT 11 23 2017 ...