• Ethernet Cables - Two standard Ethernet cables of sufficient length to attach the
DHCPatriot devices to the Ethernet switch.
• Console Cables (optional) - Two cables suitable for the console connection. We
will cover the optional console connection in more detail later.
Mounting in a two or four post rack
The DHCPatriot system may be mounted in a two post or a four post 19” telco or server
rack. This section describes mounting in a two or four post rack.
The installation steps should be
read in their entirety before
installation is started. All parts
should be unpacked, inspected
for damage and checked for
completeness before continuing
with set up. A suitable location
for installation will have a clean,
dust free environment that is
well ventilated. Do not set up
your DHCPatriot system in an
area where heat, electrical
noise, or electromagnetic fields
are generated. The area
chosen must have close access
to a grounded AC power outlet.
The location chosen should be
climate controlled with a
temperature range of 10° to 35°
C (50° to 90° F). Relative
humidity should be in the range
of 8% to 90%. Damage not
covered by the maintenance
contract may result if the
DHCPatriot system is operated
outside of this temperature or
humidity range.
When choosing a location in the rack in which to place the devices, be sure that proper
clearance is available in both the front and back. Front clearance should be no less
than 25 inches, and rear clearance should be no less than 30 inches. This ensures
proper airflow and cooling around the devices.
Chapter 3: Installation
15
DHCPatriot Version 6 Operations Manual This document © 2017 First Network Group Inc. All Rights Reserved
Figure 3.3
Содержание DHCPatriot Version 6
Страница 1: ...Operations Manual Version 6...
Страница 2: ......