Install with P-installation
In the P-installation, the pump is installed on a stationary discharge connection, and operates either
completely or partially submerged in the pumped liquid.
The following items are required:
• Guide bars
• Guide bar bracket for attaching the guide equipment to the access frame or to the upper part of the
sump
• Level regulators or other control equipment for start, stop, and alarm
• Cable holder for holding the cable and regulating the height of the level regulators
• Access frame (with covers) to which the upper guide bar bracket and cable holder can be attached
• Discharge connection for connecting the pump to the discharge line (the discharge connection has a
flange which fits the pump casing flange and a bracket for attaching the guide equipment)
• Bushings for vibration damping between the guide bars and the discharge connection
Figure 12: P-installation
1. Provide a barrier around the pump pit; for example, a guardrail.
Installation
46
C3300/6x5, C/R3231, C3240, C3306, C3312, C3351, C3356, C3400, C3501, C3531, C3602, C3800 Installation,
Operation and Maintenance Manual
Содержание C/R3231
Страница 2: ...End of Disclaimer text ...
Страница 4: ......
Страница 170: ......
Страница 171: ......