Page 24 of 7
Grouting pro
unit and foun
running equi
Care should
contact with
plate, suction
tightened aft
VERTICA
76
ovides solid co
ndation that p
pment and da
be taken to e
grout betwee
n can and fou
Foundatio
ter the grout h
AL TURBINE
ontact betwee
prevents latera
ampens reso
ensure maxim
en the pump b
undation (no v
n bolts should
has been cure
E PUMPS (VT
en the pump
al movement
nant vibration
mum surface
base, sole
voids).
d only be fully
ed.
TPS) CENTRI
of
ns.
y
L
4.5
Motors
It is the
the mo
detaile
piping
separa
pump s
separa
and ali
Flowse
4.5.1
4.5.1.1
See lift
4.5.1.2
The fo
require
a) Tw
low
b) Tw
c) Tw
att
d) Pip
co
mm
e) Ge
wr
wr
clo
f) Th
ste
inside
individ
and sk
4.5.1.3
a) Cle
oth
b) Flu
wa
c) Re
su
d) Cle
eq
IFUGAL PUM
Lifting and
s may be sup
e responsibili
otor is assem
ed in section 4
and the pum
ately or as ful
size and weig
ately, it is the
ign the pump
erve’s installa
Installation
unassemb
Lifting
1
fting methods
Equipme
2
installatio
llowing list co
ed for installat
wo (2) mobile
wering the pum
wo (2) steel cla
wo (2) sets of
taching to the
pe clamp for l
olumn pipe. A
m (3/4 in.) dia
eneral purpos
renches, sock
renches, wire
oth.
hread sealing
eel and light m
Parts and
shipping con
ual packages
kids for attach
Uncrating
3
pump
ean the parts
her foreign ma
ush the pump
ater. Clean al
emove any rus
rfaces with fin
ean all thread
quipment.
MPS ENGLIS
d Assembly
plied separat
ty of the insta
bled to the pu
4.5. Discharg
p assembly a
ly assembled
ght. If the part
customer’s re
with driver to
ation instructio
n of pumps t
bled
in section 2.3
ent and tools
on of unasse
vers the princ
tion.
cranes capab
mp and/or mo
amps of suita
chain tongs &
pump and m
ifting bowl ass
Approximately
ameter rope m
se hand tools,
ket set, screwd
brush, scrape
compound de
machinery oil.
d accessories
tainers or atta
s. Inspect all
hed parts befo
g and cleanin
of any dirt, pa
atter.
p inside and ou
ll machined su
st spots found
ne emery cloth
ded connectio
SH 71569224
flowse
y
tely from the p
aller to ensure
ump and align
ge head colum
are supplied e
d depending u
ts are shippe
esponsibility t
o the satisfact
ons.
that are ship
3.
s required for
embled pump
cipal tools/item
ble of hoisting
otor.
ble size.
& cable sling fo
otor lifting eye
sembly and th
4.5 m (15 ft) o
may be require
pipe wrenche
drivers, Allen
er and fine em
esigned for sta
may be place
ached to skid
containers, c
ore discarding
ing of unasse
acking materia
utside with cle
urfaces.
d on the mach
h.
ns and any ac
4
– 02-15
erve.com
pumps.
e that
ned as
mn
either
upon the
d
to install
tion of
ped
r
ps
ms
and
for
es.
he
of 19
ed.
es, end
mery
ainless
ed
s in
crates
g.
embled
al and
ean
hined
ccessory