Page 25 of 7
should be lef
straightness.
Ins
4.5.1.4
as
a) Sump
an
of all loo
b) Check
a
c) Do not lif
pump sh
d) When
ins
mm (6 in
fastened
shipping
vertical p
the bowl
e) If a strain
assembl
f) Position
foundatio
g) If a base
per m (0
in place.
h) Check
fo
that num
in a horiz
or pull th
i)
Carefully
assembl
section 2
j) Lower
th
Set clam
bowls on
assembl
the shaft
k) Proceed
specific c
Ins
4.5.1.5
Choose one
installation p
configuration
In
4.5.1.5.1
lu
Pu
housing insta
prevent dam
housing befo
VERTICA
76
Lineshaft w
ft in the crate
stalling the b
sembly
nd piping sho
ose debris bef
ll bolts for tigh
ft or handle th
haft.
stalling bowl a
n.) or 203 mm
d to the woode
until the bow
position. This
s or bending t
ner is to be us
y using fasten
lifting equipm
on opening.
e plate is used
.002 in. per ft
or axial cleara
mber for future
zontal position
he pump shaft
y lift the suctio
y with suitable
2.4 for lifting a
he bowl assem
mp or holding d
n a flat surface
y and reduce
t.
to install the
column pipe d
stallation of d
of the followi
procedure tha
n that has bee
nstallation of
ubrication
ump head may
alled. For eas
age, we recom
ore putting the
AL TURBINE
when shipped
to avoid dama
bowl and colu
uld be thorou
fore starting in
htness.
he bowl assem
assemblies in
(8 in.), leave
en skid that is
wl assembly is
will help prev
the shaft.
sed, attach it t
ners as neces
ment so it will c
d, level the pla
) and then gro
nce or endpla
reference (w
n you should b
t indicating ax
on barrel and t
e straps or cla
and safety rul
mbly into the w
device that is
e. This is to s
possibility of
column assem
drawings).
discharge he
ng discharge
t is appropria
en purchased
discharge he
y be shipped w
se of assembl
mmend remov
e head on the
E PUMPS (VT
d separately
age or loss of
umn
ughly cleaned
nstallation.
mbly by the
sizes of 152
bowl securely
attached for
raised to a
vent breaking
to the bowl
ssary..
center over the
ate to 0.16 mm
out and ancho
ay and record
hile bowls are
be able to pus
ial clearance)
the bowl
amps (See
les).
well or sump.
attached to
stabilize bowl
cross threadin
mbly (refer to
ead
e head type
ate to the pum
d
ead with produ
with the sealin
y and to
ving the
pump.
TPS) CENTRI
f
y
e
m
or
e
sh
).
ng
mp
uct
ng
For pu
one-pie
sealing
For pu
(heads
solid s
skippin
a) Att
co
b) Lif
int
lifti
no
fla
of
be
c) If
b
be
pu
dis
See se
shaft d
leveling
4.5.1.5
housin
preven
housin
For pu
one-pie
sealing
supplie
couple
drivers
a) Att
co
b) Att
en
c) Lif
tub
2.3
ins
Fa
su
an
d)
Us
fou
ce
IFUGAL PUM
umps supplied
ece headsha
g housing) pro
umps supplied
shaft couples
haft drivers, p
ng step (a).
tach the head
oupling and tig
ft discharge he
to place
(See
ting methods a
ot to bend the
nge and bear
head. (Note
earing retainer
baseplate is n
etween the pu
ump. The sha
scharge head
ection 4.4.4 fo
drivers and se
g details
Installat
5.2
enclosin
Pump hea
ng installed. F
nt damage, we
ng before putti
umps supplied
ece headsha
g housing) pro
ed with a two-
es above the s
s, proceed to
tach the head
oupling and tig
tach the top e
nclosing tube a
ft the discharg
be then lower
3 for recomme
structions
). B
asten the top c
pplied to botto
n alignment rin
se shims or w
undation to lev
entered in the
MPS ENGLIS
d with hollow
ft (headshaft
oceed to step
d with a two-p
above the se
proceed to ste
dshaft to the li
ghten (left han
ead over shaf
section 2.3 fo
and safety ins
shaft. Fasten
ring retainer, i
that W heads
r at the top co
not included us
mp and found
aft must be ce
.
or coupling ins
ection 4.2.1~4
tion of dischar
ng tube
ad may be sh
For ease of as
e recommend
ing the head o
d with hollow
ft (headshaft
oceed to step
-piece heads
sealing housi
step (b) direc
dshaft to the li
ghten (left han
enclosing tube
and tighten (le
ge head over s
r carefully into
ended lifting m
e sure, not to
column flange
om of head. (W
ng at the top c
wedges betwee
vel the pump.
discharge hea
SH 71569224
flowse
shaft drivers
couples belo
p (a).
piece headsha
ealing housing
ep (b) directly
neshaft with a
nd threads).
ft and lower c
or recommend
structions
). Be
n the top colum
f supplied to b
s do not have
olumn flange).
se shims or w
dation to level
ntered in the
stallation on so
4.2.4 for pump
rge head with
ipped with the
ssembly and to
d removing the
on the pump.
shaft drivers
couples belo
p (a). For pum
haft (headsha
ng) or solid s
ctly skipping s
neshaft with a
nd threads).
e to the colum
eft hand threa
shaft and enc
o place
( See s
methods and s
bend the sha
e and alignme
W heads do n
column flange
en the pump a
. The shaft m
ad.
4
– 02-15
erve.com
and a
ow
aft
g) or
y
a
arefully
ded
e sure
mn
bottom
a
wedges
the
olid
p
h the
e sealing
o
e
and a
ow
mps
aft
haft
step (a).
a
mn
ads).
closing
section
safety
aft.
ent ring if
not have
e).
and
must be