Page 22 of 7
provision of c
lead to failur
outside the t
The foundati
rigid support
expected stre
Concrete fou
installed in sl
holes in the m
below. Sleev
moldable ma
When a suct
type "TF" dis
provide perm
motor.
base, they m
to grouting.
Always shim
the leveling n
done otherw
the structura
separation of
recommenda
industry stan
Detail of a t
Leve
4.3.1
disc
MOUNTING PLA
NON-BONDI
MOLDABLE MAT
FOUNDAT
VERTICA
76
correct found
re of the pump
erms of the w
on must cons
to the discha
esses that ma
undations sho
leeves that all
mounting plate
ve should be f
aterial after sle
ion barrel is s
scharge head,
manent, rigid s
If leveling n
must be backe
near foundat
nuts. Now tig
ise there is a
l natural frequ
f the base from
All founda
ations should
ndards.
typical founda
eling of pum
charge head
ATE
NG
TERIAL
TION
AL TURBINE
ation and ins
p and, as suc
warranty.
sist of materia
rge head and
ay be encount
uld have anch
low alignment
e as illustrated
filled with non
eeve is set in
supplied as in
the suction v
support for the
nuts are used
d off as far as
tion bolts and
hten the found
risk of signific
uency that cou
m the grout.
ation / anchor
be verified by
tion bolt, grou
mps mounted
flange
A
N
E PUMPS (VT
tallation may
ch, would be
l that will affor
will absorb
tered in servic
hor bolts
t and have
d in the detail
n-bonding
place.
the case of th
vessel must
e pump and
d to level the
s possible prio
then back off
dation bolts.
cantly lowering
uld result in
bolt
y prevailing
uted.
on the
ANCHOR BOLT
GROUT
NUT
TPS) CENTRI
rd
ce.
he
or
f
If
g
Ex
The pu
aligned
assem
precisi
the mo
flange
0.16 m
the gro
Check
is still l
torque
record
friendly
require
4.3.2
The so
aligned
by usin
level. L
mounti
needs
using s
least 7
Reche
after th
installa
pit and
the sol
Check
respec
in./ft) a
should
DIS
HEAD
372
373
IFUGAL PUM
xample of a ty
m
ump assembl
d with the anc
mbly is leveled
ion machinist
otor mounting
mounting su
mm/m (0.002 i
out to set for a
k to make sure
level to within
e the nuts [373
ed for future
Directly m
y for service.
es re-leveling
Leveling o
soleplate
oleplate [23] is
d with the anc
ng a master le
Levels should
ing surfaces.
to be leveled
shims and gro
72~80 hours b
eck the solepla
he grout is set
ation. Lower th
d align the disc
leplate bolts[3
to make sure
ct to the solep
and final torqu
d be recorded
SCHARGE
D FLANGE
CONCRETE
2
MPS ENGLIS
ypical dischar
mounting flan
y [101] is low
chor bolts [37
d by using a m
t's level. Leve
g flange. The
rface needs t
in./ft) using sh
at least 72~80
e that the mot
n 0.16 mm/m
3]. The levelin
reference.
mounted pump
Re-installatio
and re-grout
of pumps mo
s first lowered
chor bolts. The
evel or a preci
be taken on t
The soleplate
to within 0.16
out. Allow the
before the pum
ate mounting
t and then pro
he pump asse
charge head f
372].
e that the pum
plate to within
ue the nuts [37
for future refe
E
SH 71569224
flowse
rge head with
nge
wered into the
72]. The pump
master level o
els should be t
discharge he
to be leveled
hims and grou
0 hours.
tor mounting
(0.002 in./ft)
ng data is to b
ps are not use
on of these p
ting.
unted on a g
d into the pit an
e soleplate is
ision machinis
the equipmen
e mounting su
6 mm/m (0.00
grout to set fo
mp is installed
surface leveln
oceed with the
embly [101] in
flange bolt ho
mp is still level
0.16 mm/m (0
73]. The leveli
erence.
4
– 02-15
erve.com
h the
pit and
p
or a
taken on
ad
to within
ut. Allow
flange
and final
be
er
pumps
grouted
nd
leveled
st's
nt
urface
02 in./ft)
or at
d.
ness
e pump
nto the
oles to
with
0.002
ing data
101