Argus Ball Valve EK, FK and HK Operating Manual – BA1000 EN
5 Installation
Page 34 of 67
4.
Assembling the Argus Ball Valve on the first flange:
Connect the Argus Ball Valve on the first flange using some bolts and position
the seal.
Ensure the correct position of the Argus Ball Valve and seal.
5.
Tighten the bolts crosswise.
Use the correct tightening torques specified by the industrial plant operator.
6.
Assemble the second flange:
Follow the same procedure as for the first flange.
7.
Check the seal after the flange connection has been completed.
Installation of the Argus Ball Valve is now complete.