Florite N920 Series Скачать руководство пользователя страница 1

 

D10140-011817 

Florite International, Inc.  

N920 Series Instrument Training Guide  

Instrument Training Guide  

 

N920 Series  

P r o c e s s   C o n t r o l  b y   D e s i g n  

Содержание N920 Series

Страница 1: ...D10140 011817 Florite International Inc N920 Series Instrument Training Guide Instrument Training Guide N920 Series Process Control by Design...

Страница 2: ...into the REM jack and con nect the wires shown to the con trolled equipment When you unit is installed with the WAN modem option then plug either end of an RJ 11 cable into the corresponding jack and...

Страница 3: ...e screen followed by setting the numbers for the lowest analog input level Then press the PROG button until reaching the Low Units screen and set the numbers for the lowest measurement units that the...

Страница 4: ...D10140 021709 900 Series Instrument Keypad Functions Lamp Indicators Navigation Structure Programming Navigation Viewing Navigation Optional Configuration...

Страница 5: ...D10140 021709 Instrument Keypad Functions...

Страница 6: ...D10140 021709 Lamp Indicators...

Страница 7: ...D10140 021709 900 Series Instrument Navigation Structure...

Страница 8: ......

Страница 9: ...D10140 021709 900 Series Instrument Programming Navigation...

Страница 10: ......

Страница 11: ......

Страница 12: ...creen by pressing the CHAN key until reaching the Sys port and then pressing the PROG key until reaching the desired screen Note the first character field blinks indicating readiness for programming S...

Страница 13: ...f a date field and a 24 hour clock time field Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressing the PROG key until reaching the desired screen Note t...

Страница 14: ...ld and a time field Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressing the PROG key until reaching the desired screen Note the first character field b...

Страница 15: ...report phone number to insure alarm information is reported When scheduled reports are enabled alarm information will be sent along with the value report which will be delayed by the programmed Repor...

Страница 16: ...maintenance diagnostic and general remote access purposes Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressing the PROG key until reaching the desired s...

Страница 17: ...s also used to completely control the logging functions including start stop upload and zero records Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressin...

Страница 18: ...struments programmed communication base address Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressing the VIEW key until reaching the desired screen Note...

Страница 19: ...ocks date and time having a 24 hour clock time field Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressing the VIEW key until reaching the desired screen...

Страница 20: ...me that a next regularity scheduled value report is to be sent Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressing the VIEW key until reaching the desi...

Страница 21: ...a time field Navigation Access this screen by pressing the CHAN key until reaching the Sys port and then pressing the PROG key until reaching the desired screen Note the first character field blinks i...

Страница 22: ......

Страница 23: ...field portion blinks indicating readiness for programming Select Field independently select the input signal field or excitation field using the QTY right or CHAN left keys Type Field select an input...

Страница 24: ...s Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the value field blinks indicating readiness...

Страница 25: ...Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the value field blinks indicating readiness fo...

Страница 26: ...creen by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first character field blinks indicating readiness for programming...

Страница 27: ...sing the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first character field blinks indicating readiness for programming Select Fie...

Страница 28: ...t Type selected Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first character field blin...

Страница 29: ...avigation Access these screens by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicating rea...

Страница 30: ...lly applied to average pulsations and reject transients in the process being measured Larger negative values represent increased filtering Navigation Access this screen by using the CHAN key until rea...

Страница 31: ...aching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicating readiness for programming Select Field select value to change by...

Страница 32: ...ntil reaching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicating readiness for programming Select Field select value to ch...

Страница 33: ...m Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicating re...

Страница 34: ...CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicating readiness for programming Select Field select v...

Страница 35: ...CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicating readiness for programming Select Field select v...

Страница 36: ...the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicating readiness for programming Select Field sele...

Страница 37: ...orting capability is enabled Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the character fie...

Страница 38: ...ecord Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the PROG key until reaching this screen Note the first numeric field blinks indicatin...

Страница 39: ...D10140 021709 900 Series Instrument Viewing Navigation...

Страница 40: ...accumulated port quantity 1 when the port time base is set for seconds minutes hours or days Navigation Access this screen by using the CHAN key until reaching the desired port number and then by usin...

Страница 41: ...ays The output port link number and arrow are displayed blinking when the linked output is performing a control function that requires using quantity 2 to perform the control process Navigation Access...

Страница 42: ...ires using the measured rate to perform the control process Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the VIEW key until reaching thi...

Страница 43: ...value offset or tare value Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the VIEW key until reaching this screen Zero Process Offset Pre...

Страница 44: ...volts Insure that no signal is connected to the port input jack Press the ZERO key Note the value now indicates zero Current Full Scale o Select the Port Type as mA Input 20 000 mA into the port Simul...

Страница 45: ...for such purposes as maintenance scheduling as a Hobbs Hour Meter would be used Navigation Access this screen by using the CHAN key until reaching the desired port number and then by using the VIEW ke...

Страница 46: ......

Страница 47: ...ng readiness for programming Select Field independently select the signal type field or link field using the QTY right or CHAN left keys Type Field select the output signal type by pressing either the...

Страница 48: ...puts its linked input port measurement as an analog signal which has been scaled using the output port interpolation values o Relay output Port Type energizes the output relay when the linked input po...

Страница 49: ...ching this screen Note the first numeric field blinks indicating readiness for programming Select Field select value to change by pressing either the QTY right or CHAN left Value change selection by p...

Страница 50: ...width slower response This value is used to match the controlled plant bandwidth to the control bandwidth Navigation Access this screen by using the CHAN key until reaching the desired port number and...

Страница 51: ...or lowest analog output values that are allowed to be output Navigation Access these screens by using the CHAN key until reaching the desired output port number and then by using the PROG key until r...

Страница 52: ...utput Port Type energizes the output relay when the linked input port detects an alarm condition Manual linked input measurements are ignored The value set in the Control Amount is converted to an ana...

Страница 53: ...l value for install diagnostic purposes Navigation Access this screen by using the CHAN key until reaching the desired output port number and then by using the VIEW key until reaching this screen Diag...

Страница 54: ...D10140 021709 900 Series Instrument Optional Configuration...

Страница 55: ......

Отзывы: