37
6.
Place the cable management system column inside the charging station mount bracket. Position it
tightly in the corner.
RECOMMENDATION
: To position the column, stand in front of the charging station and place the output
(cable clamp) of the cable management system on the exterior side. Insert a gasket between the
pedestal and the back cover.
7.
Screw the bottom column of the cable management system by placing the round spacing shim
between the pedestal and the column and firmly tightening the screws to secure the column.
8.
Insert the other end of the flexible tube into the hole provided for this purpose and screw the bushing
on the exterior of the charging station mount bracket to hold the flexible tube in place.
NOTE
that this will hold the column during the installation of the bottom column mount brackets.
9.
Install both column mount brackets starting with the first assembly (1 and 2 on the illustration), then
proceed to the second assembly (3 and 4 on the illustration).
Содержание CoRe+
Страница 1: ...1 x Pedestal and Cable Management System Installation Guide TM ...
Страница 8: ...8 3 1 2 Dimensions The image below shows the dimensions of the pedestal ...
Страница 24: ...24 Measurements for the CoRe MAXon a Wall Mounted Installation ...
Страница 47: ...47 9 2 Multiple Pedestals Multiple Devices on Separate Electrical Circuits Grounding ...