29
6.2.2.
Before Getting Started
1.
Make sure to remove the security screw used to hold the counterweight during transport when unpacking
the Cable Management System (CMS).
2.
Install a cable management system on a new station OR install a cable management system on an
existing station by following the steps below:
6.2.2.1.
Before Installing a Cable Management System on a New Single
Charging Station
1.
First, install the pedestal and the charging station. Refer to the Installing the Pedestal and Charging
Station section for more information and the
CoRe+ MAX Installation Guide
as needed.
2.
Then, install the cable management system as indicated below. Use the ¼-20 screws provided in the
package.
OR
6.2.2.2.
Before Installing a Cable Management System on an Existing
Single Charging Station
1.
Install the mount bracket for the column with the cable management system and the empty column.
Содержание CoRe+
Страница 1: ...1 x Pedestal and Cable Management System Installation Guide TM ...
Страница 8: ...8 3 1 2 Dimensions The image below shows the dimensions of the pedestal ...
Страница 24: ...24 Measurements for the CoRe MAXon a Wall Mounted Installation ...
Страница 47: ...47 9 2 Multiple Pedestals Multiple Devices on Separate Electrical Circuits Grounding ...