background image

REMOVAL & RE-FITTING OF THE FUEL-BED LOGSET

a)

The gravel material should then be first layed around the base of the

combustion chamber as shown below in Fig. 5, leaving the rear

section as shown to allow the fitiing of Log “A”

Fig. 5

b)

Place the largest Log “A” centrally onto the fuel-bed support behind the

burner flame strip. Ensure that the fuel-bed Log “A” is located centrally

in the firebox, and that the front edge is parallel with the rear face of the

burner flame strip as shown below in Fig. 6

Fig. 6

8

A

Содержание Rocco FCFL**RN3

Страница 1: ...M HEATER User Instructions These instructions should be read by the user before operating the appliance and retained for future reference Model No FCFL RN3 is for use on Natural Gas G20 at a supply pr...

Страница 2: ...the top of the appliance and the depth of the shelf does not exceed 150mm The fire may be installed below combustible shelves which exceed 150mm deep providing that the clearance above the fire is in...

Страница 3: ...i e a GAS SAFE registered Engineer The service should include visually checking the appliance flue terminal and fireplace for accumulation of debris around the firebox and inspection of the ceramic l...

Страница 4: ...from the pipe Once gas is available at the pilot by turning the control knob further anticlockwise the piezo igniter will cause a spark at the pilot to light the pilot burner Once the pilot burner is...

Страница 5: ...e main burner off at this point a clicking noise will be heard from the motor Fig 2 If the remote does not work first check the LED in the top left hand corner is illuminating when the button is press...

Страница 6: ...er than at annual service intervals If carbon or soot accumulates on the logs this should be removed by carefully brushing the fuelbed using a soft brush For instructions on how to remove the glass pa...

Страница 7: ...ions below for removal and re fitting The glass panel should be cleaned gently with a soft damp cloth and glass cleaner DO NOT UNDER ANY CIRCUMSTANCES ATTEMPT TO CLEAN THE GLASS PANEL WHEN THE APPLIAN...

Страница 8: ...Fig 5 leaving the rear section as shown to allow the fitiing of Log A Fig 5 b Place the largest Log A centrally onto the fuel bed support behind the burner flame strip Ensure that the fuel bed Log A...

Страница 9: ...bed base log A as shown below in Fig 7 using the groove in Log A as a guide for placement Fig 7 d Fit Log C into position on left hand side of the fuel bed base log A as shown below in Fig 8 using th...

Страница 10: ...base log A as shown below in Fig 9 using the groove in Log A as a guide for placement Fig 9 e Fit Log E into position at centre of the fuel bed base log A as shown below in Fig 10 using the groove in...

Страница 11: ...hown below in Fig 12 using the raised section in the base log as a guide for position Fig 12 IMPORTANT NOTE HAVING FITTED THE GRAVEL MATERIAL IN THE BASE OF THE COMBUSTION CHAMBER ENSURE THAT NONE OF...

Страница 12: ...C F articles is kept to a minimum during installation servicing we recommend that you use a HEPA filtered vacuum to remove any dust and soot accumulated in and around the fire before and after workin...

Страница 13: ...e top of the combustion chamber lid as shown below in Fig 13 14 Fig 13 Fig 14 13 IMPORTANT NOTE The trim assembly of this product is a working surface and as such will become hot in use Allow the prod...

Страница 14: ...specialist spares stockists whose details can be found on our web site www bfm europe com in the stockist section Log Set B 109780 REPLACING THE BATTERIES IN THE HANDSET a Remove the old 9V battery b...

Отзывы: