![Fischer Panda Panda PMS-HD 12-4KU Скачать руководство пользователя страница 99](http://html1.mh-extra.com/html/fischer-panda/panda-pms-hd-12-4ku/panda-pms-hd-12-4ku_manual_2294313099.webp)
Installation Instructions
8.7.08
Panda PMS 8.000 NE - 42 NE Manual.R04 - Capture D: Installation Instructions Seite 99
D.8.2 Installation AC-Box / distribution panel separate connected
Fig. D.8.2-1: Installation AC-Box / distribution panel separate connected
A power source selector switch must be installed between the generator (or if applicable,
AC-Control box) and the ship's electrical supply system. This switch must used to ensure
that all AC consumers can be switched off at once. This switch should also be installed to
keep the generator and shore (grid) power systems separate.
A 3-way cam switch should be used. This
switch basic positions: "Shore power" -
"OFF" - "Generator". If an (DC-AC) inver-
ter is used, a fourth position will be requi-
red.
0. OFF
I. Generator
II. Shore power connection
III. Inverter
Fig. D.8.2-2: 3-Way Cam Switch
1. Generator
2. Battery
3. AC-Control Box
4. Distribution panel
5. Remote control panel
6. Fuel pump
Содержание Panda PMS-HD 12-4KU
Страница 58: ...Generator Failure Seite 58 Panda PMS 8 000 NE 42 NE Manual R04 Kapitel B Generator Failure 8 7 08 Blank...
Страница 76: ...Maintenance Instructions Seite 76 Panda PMS 8 000 NE 42 NE Manual R04 Kapitel C Maintenance Instructions 8 7 08...
Страница 104: ...Installation Instructions Seite 104 Panda PMS 8 000 NE 42 NE Manual R04 Capture D Installation Instructions 8 7 08 Blank...
Страница 116: ...Tables Page 116 Panda PMS 8 000 NE 42 NE Manual Chapter E Tables HP3 120V 60 Hz DVS 400V 50 Hz DVS 120V 240V 60 Hz...
Страница 120: ...Tables Page 120 Panda PMS 8 000 NE 42 NE Manual Chapter E Tables...
Страница 122: ...Generator Data F 2 Capsule measurements...
Страница 148: ...Measurements Page 148 Panel Generator Control P6 RE0703_Kunde_eng R02 Chapter B Measurements 8 7 08 Intentionally Blank...