5
Installation
Installation
Note: Installation should be done by a qualified service technician that is locally licensed
.
1. In the photo at right there is a bowl with a gas riser
centered in the bowl. It is recommended to position the
gas riser in the center to ensure the fire ring is centered in
the bowl once installation is complete.
NOTE:
Drainage MUST be provided in the bowl.
Drainage can be obtained by making holes in the bottom
or sides of the bowl or elevating the bowl off the
mounting surface by way of spacers or similar method.
2. Apply pipe dope/tape to the gas stub and thread the
AWEIS Ignition Control Box onto the gas riser as shown
in the photo at right.
NOTE:
Leak Test – it is highly recommended to perform
a gas leak test at this point in the install. Turn on the gas
supply and then, using a soapy water solution spray the
bottom of the AWEIS where it is connected to the gas line
to ensure no leaks exist.
Gas
Stub
Battery Powered All Weather Electronic Ignition System Components
Low Profile Control Panel
Dimensions: 2” x 2.5”
Standard Control Panel
Dimensions: 4.5” x 4.5”
Ignition
Control Box
Control
Panel
Waterproof
Battery Pack
Pilot Burner
Assembly