![Fiori DB 460 Скачать руководство пользователя страница 101](http://html.mh-extra.com/html/fiori/db-460/db-460_use-and-maintenance-manual_2290574101.webp)
101
4
OPERATION AND USE
id.:
DB 460 REV. 00 02/01/2015
4.10.7.a Heaped aggregate
(fi g. 37)
- Keep the drum rotating at top speed.
- Lower the arm after checking that the hatch has closed.
- On the mechanical gearbox, select the 1st working speed (low).
- Dig into the heap with the bucket and at the same time raise the arm, that way fi lling the bucket with a larger
4.10.6.b Cement in silos
(fi g. 36)
4.10.7 AGGREGATE LOADING
37
4030
36
- Keep the drum rotating at top speed.
- Raise the bucket arm to its maximum height (4030 mm)
- Move to underneath the unloading point of the silo.
- Calculate the quantity of cement to be loaded referring to the CONCRETE COMPOSITION AND BATCHING
TABLE in chapter 4.10.4.
- Open the unloading hatch and fi ll the drum using the silo dosage system.
Содержание DB 460
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 22: ......
Страница 48: ...48 3 SAFETY PRECAUTIONS id DB 460 REV 00 02 01 2015 VEHICLE EXTERIOR ...
Страница 110: ......
Страница 154: ......
Страница 166: ...166 TECHNICAL ANNEXES DB 460 REV 00 02 01 2015 id HYDRAULIC DIAGRAM ...
Страница 168: ......
Страница 169: ...SEBU8325 01 July 2012 Operation and Maintenance Manual 1104D Mech Industrial Engine NK Engine NL Engine NM Engine ...
Страница 252: ... 2012 Perkins Engines Company Limited All Rights Reserved ...