![Festo CMXR-C2 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/festo/cmxr-c2/cmxr-c2_assembly-and-installation-manual_2283148026.webp)
2. Assembly
26
Festo GDCP-CMXR-C2-HW-EN 1002NH
2.3
Guidelines for the installation
The device is intended to be installed into a control cabinet in a horizontal position. Take
the wiring for the device into consideration prior to assembly. Keep the device away from
cables with high levels of interference. Leave sufficient space for the wiring and cooling
system.
Mounting dimensions and mounting clearances
A clearance of 50 mm, above and below the modules, must be maintained for the air
circulation.
The depth of the module is 100 mm. In determining the required control cabinet depth,
the height of the plug connectors plus an additional 20 mm approx. must be taken into
account.
H1:
121 mm
L1:
270 mm
H2:
72 mm
L2:
22.5 mm
H3:
50 mm
L3:
10 mm
L4:
4 mm
Fig. 2.5 Dimensions and mounting clearances
Air-conditioning and ventilation
The upper and lower sides of the module are equipped with ventilation slots for heat
dissipation. When the permissible ambient temperature is maintained there is no need for
an external fan. It is, however, absolutely vital that the ventilation slots are kept clear.
Содержание CMXR-C2
Страница 1: ...Controller Description Assembly and installation Type CMXR C2 Description 571 694 en 1002NH 751 509...
Страница 2: ......
Страница 5: ...Festo GDCP CMXR C2 HW EN 1002NH 5...
Страница 30: ...2 Assembly 30 Festo GDCP CMXR C2 HW EN 1002NH 1 End supports Fig 2 8 Securing the device with end supports 1 1...
Страница 56: ...6 Maintenance and care 56 Festo GDCP CMXR C2 HW EN 1002NH...