3. Commissioning
3-5
Festo P.BE-CPX-FVDA-P2-EN en 1209NH English
3.2
Preparing for commissioning
1. Make sure that the CPX terminal is correctly mounted
(
CPX system description).
2. Check the wiring (connecting cable, pin allocation)
(
chapter 2.3.1).
3. Dismantle the connection block of the output module
(
section 2.5.1).
4. Check the module for excellent status.
5. Set the PROFIsafe address through the DIL switches on
the module and mount the connection block
(
section 2.5.2).
Содержание 1971599
Страница 2: ......
Страница 75: ...Installation 2 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 2 Installation...
Страница 91: ...Commissioning 3 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 3 Commissioning...
Страница 112: ...3 Commissioning 3 22 Festo P BE CPX FVDA P2 EN en 1209NH English...
Страница 113: ...Operation 4 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 4 Operation...
Страница 117: ...Diagnostics and error handling 5 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 5 Diagnostics and error handling...
Страница 129: ...Service repair disposal 6 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 6 Service repair disposal...
Страница 133: ...Technical appendix A 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix A Technical appendix...
Страница 143: ...Index B 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix B Index...
Страница 144: ...B Index B 2 Festo P BE CPX FVDA P2 EN en 1209NH English Table of contents B Index B 1...
Страница 150: ...B Index B 8 Festo P BE CPX FVDA P2 EN en 1209NH English W Wire break 3 12 5 4...