3. Commissioning
3-12
Festo P.BE-CPX-FVDA-P2-EN en 1209NH English
Module parameter: Monitoring wire break
Operator unit
Bit
Monitor wire break
Bit 0:
output channel 0
Bit 1:
output channel 1
Bit 2:
output channel 2
Bit 3 ... 7: reserved
[Monitor wire break]
[Channel 0]
[Channel 1]
[Channel 2]
Values
0 = inactive
1 = active
Presettings:
– Output channel 0: inactive
– Output channel 1: inactive
– Output channel 2: inactive
[Inactive]
[Active]
Note
Wire break monitoring is possible only with a switched-on output channel. If
monitoring is active and a wire break occurs, the error LED of the corresponding
channel flashes. If monitoring is switched off, any diagnostic message present is
reset. A wire break diagnostic does not switch off the output channel.
Tab. 3/7:
Monitoring of wire fracture (channel-specific)
Module parameter: DIL switch setting
Operator unit
Function no.
4828 + m * 64 +
22
m = module number (0 ... 47)
4828 + m * 64 +
23
Description
Specifies the switch setting of the PROFIsafe address selection switch on the
module.
In addition to the PROFISsafe parameter F_DEST_ADD (
section 3.4), the set-
ting of the address selection switch can be read out through CPX parameters for
diagnostic purposes – e.g. with the operator unit (read only).
Bit
Low byte (4828 + m * 64 +
22)
Bit 0:
SW 0
Bit 1:
SW 1
...
Bit 7:
SW 7
High byte 4828 + m * 64 +
23)
Bit 0:
SW 8
Bit 1:
SW 9
Bit 2 ... 7: reserved or 0
[PROFIsafe Addr]
Содержание 1971599
Страница 2: ......
Страница 75: ...Installation 2 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 2 Installation...
Страница 91: ...Commissioning 3 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 3 Commissioning...
Страница 112: ...3 Commissioning 3 22 Festo P BE CPX FVDA P2 EN en 1209NH English...
Страница 113: ...Operation 4 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 4 Operation...
Страница 117: ...Diagnostics and error handling 5 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 5 Diagnostics and error handling...
Страница 129: ...Service repair disposal 6 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 6 Service repair disposal...
Страница 133: ...Technical appendix A 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix A Technical appendix...
Страница 143: ...Index B 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix B Index...
Страница 144: ...B Index B 2 Festo P BE CPX FVDA P2 EN en 1209NH English Table of contents B Index B 1...
Страница 150: ...B Index B 8 Festo P BE CPX FVDA P2 EN en 1209NH English W Wire break 3 12 5 4...