2. Installation
2-12
Festo P.BE-CPX-FVDA-P2-EN en 1209NH English
This is how you set the PROFIsafe address at the DIL switch:
Note
Incorrect handling can cause damage to the electronics
modules.
•
First switch off the supply voltage before conducting any
mounting or installation work.
•
Only switch on the electrical supply voltage when the
product has been fully assembled and all of the installa-
tion work is complete.
1. Switch off the power supplies for the CPX terminal.
2. Remove the mounted connection block (
section 2.5.1).
3. Carefully set the desired PROFIsafe address at the DIL
switch with a suitable tool, e.g. a small watchmaker’s
screwdriver.
When mounting, observe the instruction in section 2.5.2
(threaded connector without distortion, clean connection
surfaces, etc.).
4. Remount the connection block. Tightening torque
Technical data (appendix A.1).
Содержание 1971599
Страница 2: ......
Страница 75: ...Installation 2 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 2 Installation...
Страница 91: ...Commissioning 3 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 3 Commissioning...
Страница 112: ...3 Commissioning 3 22 Festo P BE CPX FVDA P2 EN en 1209NH English...
Страница 113: ...Operation 4 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 4 Operation...
Страница 117: ...Diagnostics and error handling 5 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 5 Diagnostics and error handling...
Страница 129: ...Service repair disposal 6 1 Festo P BE CPX FVDA P2 EN en 1209NH English Chapter 6 Service repair disposal...
Страница 133: ...Technical appendix A 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix A Technical appendix...
Страница 143: ...Index B 1 Festo P BE CPX FVDA P2 EN en 1209NH English Appendix B Index...
Страница 144: ...B Index B 2 Festo P BE CPX FVDA P2 EN en 1209NH English Table of contents B Index B 1...
Страница 150: ...B Index B 8 Festo P BE CPX FVDA P2 EN en 1209NH English W Wire break 3 12 5 4...